BRIDGE UNIT FOR MAILBOX INSTALLATION (G912)
G065 1-32 SM
22. Remove the seal [A].
23. Attach the grounding bracket [B] (! x 3 - M4x8).
24. Attach the shielding plate [C] to the finisher (! x 2 - M3x8).
25. Attach the finisher to the mailbox (refer to the finisher installation procedure).
26. Turn on the main switch of the main machine and check the bridge unit
operation. (Select a print mode that uses the finisher.)
G912I502.WMF
G912I512.WMF
[B]
[C]
[A]
Comments to this Manuals