4. Install 3 clamps [D]
5. Install the interface board [E], and connect the tray heater harness [F] to
the interface board. Then, clamp the harness as shown in the illustration.
6. Connect the interface harness [G] to the motor [H] and interface board.
7. Reassemble the machine.
8. Check the printer side-to-side registration (3rd and 4th tray).
NOTE:
Tell the customer that even when the copier’s main switch is
turned off, the copier power cord should be plugged in.
Otherwise, the tray heater will not function.
[E]
[D]
[F]
[H]
[G]
A193I509.wmf
COPIER INSTALLATION 1 August 1996
3-24
Comments to this Manuals